Well 1 Vault Replacement Project CIPW13

In general the work consists of safety and operational improvements at the Well No. 1 vault. This includes replacement of the vault cover with a new traffic-rated OSHA compliant double access hatch. Replacement of the two existing sodium hypochlorite storage tanks with three new sodium hypochlorite storage tanks and the additional of a mixing tank inside the vault. Relocation of the existing chemical metering pump and power receptacle. Installation of a new forced-air ventilation system, as well as waterproofing of the interior vault.

Status

Bidding Closed

Prebid Date 3/30/23 1:00pm
Bid Date 4/17/23 2:00pm

Company & Contacts

City of Sonoma
Giuseppe Tomasino  
Giuseppe.tomasino@ghd.com

Location

Sonoma, CA