Well 1 Vault Replacement Project CIPW13
In general the work consists of safety and operational improvements at the Well No. 1 vault. This includes replacement of the vault cover with a new traffic-rated OSHA compliant double access hatch. Replacement of the two existing sodium hypochlorite storage tanks with three new sodium hypochlorite storage tanks and the additional of a mixing tank inside the vault. Relocation of the existing chemical metering pump and power receptacle. Installation of a new forced-air ventilation system, as well as waterproofing of the interior vault.
Amendment 1
(click to expand/collapse)
Name | Size | |||
Well No 1 Vault Amendment 1 | 243.9 KB |
Amendment 2
(click to expand/collapse)
Name | Size | |||
City of Sonoma Well #1 RFIs | 102.2 KB | |||
Sheet C-101-Addendum 1 | 1.1 MB | |||
Well No 1 Vault Amendment 2 | 146.3 KB |