Fryer Creek Pedestrian and Bicycle Bridge
In general, the work consists of street and Class I pathway improvements, including installation of pre-engineered and pre-fabricated clear span steel truss pedestrian bridge, concrete bridge abutments and work at each approach to the new bridge, including new signage, striping and pavement markings, removal and replacement of existing curb and gutter, construction of new HMA pavement section, HMA overlay and grinding, concrete sidewalk, driveway and pathway, new ADA curb ramps and upgrading existing curb ramps for ADA compliance, tree removal, new street light, traffic control and other related work, as set forth on the project Plans and Specifications.
Plans
(click to expand/collapse)
Name | Size | ||
Plans_R3 | 8.8 MB |