2022 Citywide Slurry Seal Project No. 2201

In general, the work consists of street and multi-use trail (pathway) surface treatment (slurry seal) for various streets throughout the City, including surface preperation, crack seal, slurry seal, removal and replacement of pavement striping and markings, protection of existing utility structures, curb and gutter, cross gutter, traffic control, water pollution control and other related work as set forth on the project Figures, Plans and Specifications.

Status

Bidding Closed

Bid Date 5/5/22 2:00pm

Company & Contacts

City of Sonoma
Matt Wargula  
matt.wargula@ghd.com

Location

Sonoma, Ca

ONLINE BIDS DUE BY: THURSDAY, MAY 5TH, 2022 @ 2:00 PM

ENGINEER’S ESTIMATE: $336,100