2022 Citywide Slurry Seal Project No. 2201
In general, the work consists of street and multi-use trail (pathway) surface treatment (slurry seal) for various streets throughout the City, including surface preperation, crack seal, slurry seal, removal and replacement of pavement striping and markings, protection of existing utility structures, curb and gutter, cross gutter, traffic control, water pollution control and other related work as set forth on the project Figures, Plans and Specifications.
Status
Bidding Closed
Bid Date | 5/5/22 2:00pm |
Company & Contacts
City of Sonoma
Matt Wargula
matt.wargula@ghd.com
Location
Sonoma, Ca
ONLINE BIDS DUE BY: THURSDAY, MAY 5TH, 2022 @ 2:00 PM
ENGINEER’S ESTIMATE: $336,100